Foreign wind power investors in Kazakhstan can build, acquire during construction, or develop with partners. Each route relocates uncertainty. This article develops a comparative qualitative framework for choosing among these modes and governing their risks. Public records concerning Zhanatas, Shokpar, Dostyk, two different Arkalyk assets, and the announced 1 GW program form the evidence base. The RIGOR framework assesses Rights completeness, Information reliability, Governance complementarity, Option value, and Residual risk. An integrated acquisition model then links eight diligence domains to legality, loss pathway, liability allocation, and post-closing leadership. Public facts, allegations, and practitioner interpretations are separated. Greenfield development suits investors with patient development capability and a need for design control. Construction-stage acquisition can save time when rights are formed and evidence is auditable, but it concentrates interface and completion risk. Joint development suits high local complementarity and program optionality when governance rights are explicit. Dostyk also shows how publicly reported credit insurance and RMB project finance can support an acquired project without replacing asset diligence. The article avoids confidential transaction data.

Keywords: entry mode, wind power, Kazakhstan, greenfield development, construction-stage acquisition, joint development, due diligence, project finance, risk governance

Список литературы

  1. Williamson, O. E. (1985). The Economic Institutions of Capitalism. New York: Free Press.
  2. Anderson, E., and Gatignon, H. (1986). Modes of foreign entry: A transaction cost analysis and propositions. Journal of International Business Studies, 17(3), 1-26.
  3. Hennart, J. F., and Park, Y. R. (1993). Greenfield versus acquisition: The strategy of Japanese investors in the United States. Management Science, 39(9), 1054-1070.
  4. Brouthers, K. D., and Brouthers, L. E. (2000). Acquisition or greenfield start-up? Institutional, cultural and transaction cost influences. Strategic Management Journal, 21(1), 89-97.
  5. Kogut, B. (1991). Joint ventures and the option to expand and acquire. Management Science, 37(1), 19-33.
  6. Dixit, A. K., and Pindyck, R. S. (1994). Investment Under Uncertainty. Princeton: Princeton University Press.
  7. Trigeorgis, L., and Reuer, J. J. (2017). Real options theory in strategic management. Strategic Management Journal, 38(1), 42-63.
  8. Meyer, K. E., and Estrin, S. (2001). Brownfield entry in emerging markets. Journal of International Business Studies, 32(3), 575-584.
  9. Slangen, A. H. L., and Hennart, J. F. (2007). Greenfield or acquisition entry: A review of the empirical foreign establishment mode literature. Journal of International Management, 13(4), 403-429.
  10. Haleblian, J., Devers, C. E., McNamara, G., Carpenter, M. A., and Davison, R. B. (2009). Taking stock of what we know about mergers and acquisitions: A review and research agenda. Journal of Management, 35(3), 469-502.
  11. Zollo, M., and Meier, D. (2008). What is M&A performance? Academy of Management Perspectives, 22(3), 55-77.
  12. Wustenhagen, R., and Menichetti, E. (2012). Strategic choices for renewable energy investment: Conceptual framework and opportunities for further research. Energy Policy, 40, 1-10.
  13. Gatzert, N., and Kosub, T. (2016). Risks and risk management of renewable energy projects: The case of onshore and offshore wind parks. Renewable and Sustainable Energy Reviews, 60, 982-998.
  14. Steffen, B. (2018). The importance of project finance for renewable energy projects. Energy Economics, 69, 280-294.
  15. Republic of Kazakhstan. (2009, as amended). Law No. 165-IV on Support for the Use of Renewable Energy Sources. Adilet Legal Information System. https://adilet.zan.kz/eng/docs/Z090000165_
  16. Financial Settlement Centre for Support of Renewable Energy Sources. Renewable energy auction materials and sector information. https://rfc.kz/en/res-sector/auctions/materials/
  17. International Energy Agency. (2022). Kazakhstan 2022: Energy Sector Review. Paris: IEA. https://www.iea.org/reports/kazakhstan-2022
  18. European Bank for Reconstruction and Development. Zhanatas Wind Power Plant, project 50569. https://www.ebrd.com/home/work-with-us/projects/psd/50569.html
  19. Asian Infrastructure Investment Bank. (2019). Kazakhstan: Zhanatas 100 MW Wind Power Plant. https://www.aiib.org/en/projects/details/2019/approved/Kazakhstan-Zhanatas-100-MW-Wind-Power-Plant.html
  20. Asian Infrastructure Investment Bank. (2023). Kazakhstan: Shokpar 100 MW Wind Power Project. https://www.aiib.org/en/projects/details/2023/approved/Kazakhstan-Shokpar-100MW-Wind-Power-Project.html
  21. European Bank for Reconstruction and Development. Shokpar Wind Power Project, project 52946. https://www.ebrd.com/home/work-with-us/projects/psd/52946.html
  22. European Bank for Reconstruction and Development, Independent Project Accountability Mechanism. KAZREF II Shokpar Wind, case registry. https://www.ebrd.com/home/what-we-do/projects/independent-project-accountability-mechanism/case-registry/KAZREF-II-Shokpar-Wind.html
  23. China Export and Credit Insurance Corporation, reproduced by Asian Financial Cooperation Association. China Sinosure underwrites Kazakhstan Dostyk 50 MW wind power project and supports project financing for a Chinese enterprise acquisition. https://cn.afca-asia.org/Portal.do?contentID=3721&method=detailView&returnChannelID=3
  24. SANY Renewable Energy. Global project portfolio and Kazakhstan Dostyk 50 MW project. https://en.sanyre.com.cn/upload/1/cc/1755655571515.pdf
  25. Akimat of Kostanay Region. (2024, February 1). Energy supply and commissioning of the 48 MW Arkalyk wind plant. https://www.gov.kz/memleket/entities/kostanai/press/news/details/697336?lang=ru
  26. Kazakhstan Electricity and Power Market Operator. (2022). Results of the auction for selection of renewable energy projects, Arkalyk wind project, 28 November 2022. https://www.korem.kz/eng/press-centr/archive_otrasli?cid=126&rid=11046
  27. Asian Infrastructure Investment Bank. (2024). Akmola Wind Power Project Non-Technical Summary, including the 15 MW Arkalyk Wind Power Plant LLP subproject. https://www.aiib.org/en/projects/details/2024/_download/Kazakhstan/1-Akmola-Project-Non-Technical-Summary.pdf
  28. Samruk-Kazyna. (2023, December 6). Samruk-Kazyna and China Power International Holding advance a 1 GW wind project with energy storage. https://www.sk.kz/press-center/news/77426/?lang=en
  29. Samruk-Kazyna. (2026, January 29). Kazakhstan and China advance a 1 GW wind project in Pavlodar Region. https://sk.kz/press-center/news/78809/?lang=en
  30. Samruk-Energy. (2026, March 30). Samruk-Energy launches construction of a major wind power project in the CIS. https://samruk-energy.kz/en/press-center/news/2664-samruk-energy-jsc-launches-construction-of-another-major-wind-power-project-in-the-cis
  31. International Finance Corporation. (2012). Performance Standards on Environmental and Social Sustainability. Washington, DC: IFC. https://www.ifc.org/en/insights-reports/2012/ifc-performance-standards
  32. European Bank for Reconstruction and Development. (2019). Environmental and Social Policy. London: EBRD. https://www.ebrd.com/news/publications/policies/environmental-and-social-policy-esp.html
  33. Organisation for Economic Co-operation and Development. (2018). OECD Due Diligence Guidance for Responsible Business Conduct. Paris: OECD Publishing. https://doi.org/10.1787/15f5f4b3-en

Как цитировать

Cheng C. BUILD, BUY, OR PARTNER? ENTRY MODE SELECTION AND RISK GOVERNANCE FOR WIND POWER INVESTMENT IN KAZAKHSTAN // Central Asian Scientific Journal. – 2026. – No. 4(32), Vol. 1. – Pp. 133–145.

Отзывы о статье

Оставить отзыв

Оцените статью и поделитесь мнением. Отзыв появится после проверки модератором.

Оценка